Friday, October 11, 2013

Day 10 (Friday) - Grout, more electrical, wall patching


  1. The double switch looks to be wired.  On the left (closer to the shower) will be a timer for the shower light & fan.  On the right (closer to the heater) will be a timer for the heater.
  2. The shower and backsplash are grouted & it looks great
  3. The half-wall & seam area next to the shower & various other wall spots have been patched.
  4. Matt arrived with the Marmoleum mid-day.  It's supposed to acclimate awhile before installation.  Bad news, though --- it's the wrong color!  Mushroom instead of Parchment Beige.  We put the roll in the bathroom to see if maybe it would be ok, but it seems too dark.  :(  In the morning I'll go check out samples of Parchment Beige & Mushroom & bring them back to compare.  Assuming we still like Parchment Beige the best, Matt will get it reordered right away & try to get it here in time for Wed. install.
  5. I've been researching toilets & stopped by Home Depot to looked at them.  I was hoping to actually sit on one ;) to see if "comfort height" really was comfortable, but it wasn't possible - the display was mounted high on a wall.  The Kohler Cimarron 1.6 gpf looks nice, gets pretty good reviews, & I think is the one Matt likes for the way the tank & toilet bolt together.  








Matt working on the switch.



No comments:

Post a Comment