Wednesday, October 9, 2013

Day 8 (Wednesday) - Tile, electrical, countertop & sink

  1. This morning George brought sheets of the mosaic that will be used as an accent line in the shower and on the backsplash.  We determined how much to use each place.
    • The mosaic sheets have a repeating pattern every 3 rows.
    • The plan for the shower is 6 rows of mosaic.
    • The plan for the backsplash is 3 rows of mosaic, with shower tile above and below that.
  2. The shower tile is laid, including the shower cubby, with spacing left for the mosaic liner.
  3. The shower floor tile is in.
  4. The countertop arrived and was installed with the sink under Matt's supervision.  The installers made 2 dry-runs with a luan template to plan out how to navigate the corners & line things up before they brought the counter in.  The fumes from the adhesive (apparently the catalyst that hardens the epoxy) were dreadful, but relatively short-lived.
  5. Preparations for the fan & switch install were done, e.g. mortising & running electrical cable and the fan was installed.
  6. The guy who will fabricate the glass door & half-wall came and took measurements.





New fan mounted in ceiling

Matt and George