Saturday, October 12, 2013

Day 11 (Saturday) - Getting ready for texture & paint, electrical, floor

I'm not sure what all was done today:
  1. I brought home some flooring samples & we decided to go with Parchment Beige.  There's none in Portland; the nearest is in Seattle.  Hopefully it will arrive here in time to stay on schedule for Wednesday completion, but it may not.
  2. Everything that's not going to be painted has been carefully taped off & protected.  On the downside, however, we can't see the counter, tile or backsplash now to try to figure out paint color.
  3. One of the switches seems to be in, as well as the can light for the shower.
  4. Something's been applied to the floor & planning for the self-coving has been done.
  5. The back patio is no longer full of equipment.  It's all been put away & the space cleaned up.