- The double switch looks to be wired. On the left (closer to the shower) will be a timer for the shower light & fan. On the right (closer to the heater) will be a timer for the heater.
- The shower and backsplash are grouted & it looks great
- The half-wall & seam area next to the shower & various other wall spots have been patched.
- Matt arrived with the Marmoleum mid-day. It's supposed to acclimate awhile before installation. Bad news, though --- it's the wrong color! Mushroom instead of Parchment Beige. We put the roll in the bathroom to see if maybe it would be ok, but it seems too dark. :( In the morning I'll go check out samples of Parchment Beige & Mushroom & bring them back to compare. Assuming we still like Parchment Beige the best, Matt will get it reordered right away & try to get it here in time for Wed. install.
- I've been researching toilets & stopped by Home Depot to looked at them. I was hoping to actually sit on one ;) to see if "comfort height" really was comfortable, but it wasn't possible - the display was mounted high on a wall. The Kohler Cimarron 1.6 gpf looks nice, gets pretty good reviews, & I think is the one Matt likes for the way the tank & toilet bolt together.
Matt working on the switch. |
No comments:
Post a Comment