- The flooring dried nicely overnight. :)
- The electrical box at the shower entrance is history. A new switch/ timer will move to a new "legal" location (code says it can't be within reach when standing in a wet shower. I thought... "that's a little overly conservative," but shortly thereafter changed my mind when insulation of the white wire to the existing switch turned out to be abraded, apparently from a ragged edge on the box, & energized the box while Matt was removing it. Eek!)
- The soffit & studs making up the NW corner of the shower are gone and the roof did not collapse, so they truly weren't load-bearing. ;)
- The iron water lines in the shower have been replaced with PEX tubing and run to the E wall.
- New drain installed & re-centered (was off-center before).
- Dry rot was shaved off stud.
- We decided on an oval sink.
Tuesday, October 1, 2013
Day 2 (Tuesday) - More demo & some plumbing