- The existing lights in the soffit above the sink look fine, so we're keeping them. Matt climbed up in the attic & fully checked them out. (p.s. Brian - he said it's the best lit attic he's ever been in; too bad it wasn't in the part he was working in.)
- There's more backer board up & a ceiling in the shower and the seams are taped.
- There's a coat of something over the mud in the shower pan.
- There's a hole in the ceiling where the old exhaust fan was.
Monday, October 7, 2013
Day 6 (Monday) - More backer board, some electrical
George arrived back from vacation today to help Matt with the project.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment