- The first 5 courses of tile were laid -- up to where the mosaic accent will be installed.
- A 12" x 12" shower cubby was constructed in the half wall -- a place to set shampoo, body wash, etc.
- The shower curb and top of the half-wall were pitched and tiled. The pitch caused some angst because it seemed so extreme, but both George & Matt said it's standard (& subsequently the glass door guy seemed to agree & had stories about situations where others had done it wrong). I think we won't notice it when the glass is in. I also checked it from head-on, as if entering the shower, & it's imperceptible then.
- The new shower ceiling was put in. A shower light will be installed later.
- The outside of the half-wall was dry-walled.
- The water-damaged subfloor around the toilet was removed & blocking added. A new plywood subfloor was installed.
Tuesday, October 8, 2013
Day 7 (Tuesday) - Tile, shower cubby, toilet floor.
Jose came back to work with George today, while Matt took care of other business. They put in close to a 12-hr day -- those boys worked hard!